${site.data.firmName}${SEMFirmNameAlt}

Millions Recovered

  • $5,400,000.00 settlement involving a seaman who fell from a stairway during fire and boat drill aboard a container ship sustaining quadriplegic injuries. Partners Mellusi and Shisha personally inspected the vessel taking hundreds of measurements and still and videos of every stairway in the ship’s main deck house. The data was compared with the vessel’s design plans in our library which demonstrated the vessel had been negligently constructed in that it failed to follow the naval architect’s original design specifications.
  • $4,400,000.00 jury award to a former shipmate who sustained a shoulder injury while at sea. The third mate had to undergo multiple surgeries and will not be able to become a captain because of the injury.
  • $2,400,000 jury award to a licensed marine engineer who sustained permanent knee injuries while attempting to remove a 200 lb. valve from an overhead piping system. Partner Mellusi personally inspected the ship’s engine room taking detailed photos and measurements. A duplicate valve was obtained from a maritime junkyard and was brought into court along with an auto-shop mechanical hoist capable of lifting it 12 feet to demonstrate the vessel lacked suitable means to perform this work safely. The jury award was in top ten verdicts in the United States for a comparable knee injury. The case was tried to verdict in a New York Federal Court.
  • $2,980,000.00 jury award to a ship’s cook for back injury resulting from insufficient procedures for moving ship stores. Case tried in New York federal court.
  • $2,700,000.00 settlement to a mate on a Tanker vessel who sustained multiple fractures.
  • $2,000,000.00 was awarded to a barge deckhand – wrongful death.
  • $1,827,000 awarded to a marine engineer working on a US Government supply vessel who fell into an unguarded ventilation fan causing neck, shoulder and hand injuries. The case was tried non-jury before a federal judge in Baltimore Federal Court. The court award was subsequently determined to be within the highest ten verdicts for the State of Maryland in 2009.
  • $1,200,000.00 jury award to a ship’s Bosun who sustained shoulder and neck injuries while attempting to move plywood sheets on main deck of vessel during 40 knot winds. Case tried in New York Federal Court.
  • $950,000 awarded to passenger killed when his recreational boat came into collision with tow wire of tug and barge
  • $850,000 settlement, Federal Court Allentown PA., to seaman sustained herniated disk while lifting a 110 lbs crane hooks.
  • $840,000 jury award to a seaman who fell from ladder while painting sustaining fractured wrist.
Practice Areas Menu

APM Terminals is bringing megaships to New York

Longshoremen who work for the Port of New York and New Jersey may be used to the rushed pace and heavy workload involved in loading and unloading container ships. After all, it is the largest port complex on the East Coast. To continue to hold its own in global shipping markets, the Port Authority must now be able to accommodate the megaships that are taking their place in the industry.

MarineLink.com notes that longshoremen may be facing some big adjustments when loading and unloading these vessels, which can hold 18,000 twenty-foot equivalent units and more. Cranes must be larger, and skilled staff must be in place to operate them so the work can move quickly. The infrastructure to handle the increased traffic from the trucks, railcars and barges necessary to take the units to their next destinations must also be expanded. In many ports, container ship turnaround is expected to take one day or less.

According to gCaptain, the goal to bring in megacarriers and the challenges that come with them is becoming a reality due to $200 million in investments by APM Terminals. The improvement projects for the company's Port Elizabeth facility include the following:

  • Adding new berths
  • Purchasing four next-generation cranes
  • Heightening the Bayonne Bridge from 151 to 215 feet
  • Increasing terminal capacity from 1.5 million to 2.3 million TEUs
  • Upgrading container handling equipment
  • Expanding gate complex trucks

Other operational and infrastructure improvements are also being made. The company plans for continuous service throughout the expansion process, some of which has already been completed.

 

No Comments

Leave a comment
Comment Information
Email Us For A Response

Let Us Help You

Bold labels are required.

Contact Information
disclaimer.

The use of the Internet or this form for communication with the firm or any individual member of the firm does not establish an attorney-client relationship. Confidential or time-sensitive information should not be sent through this form.

close

Privacy Policy

Maritime FAQ

How do I know if I need an attorney?

Because of the complexities of Admiralty and Maritime Law, virtually all situations involving bodily injury and death require a timely consult with experienced maritime counsel.

Get More Answers

Rated By Superlawyer Ralph J Mellusi Rated By Superlawyer Ralph J Mellusi
Rated By Superlawyer Ralph J Mellusi Rated By Superlawyer Ralph J Mellusi
Rated By Sfpracuperlawyer Ralph J Mellusi Rated By Superlawyer Ralph J Mellusi